BSS060-6 Project Management Assignment Sample 2023

1. Introduction

The recent research focuses on the analysis of the project management theory and the project management methodology of the project work. In analysing this it will detail the analysis of PRINCE 2 methodology. It will provide an analysis of the project management theory,   which will help to evaluate certain approaches to define the methodology of the project. The primary challenge in this aspect regarding project management intends to attain the objectives within provided constraints. The present research is set out to detail project management methodology in relation to utilization of PRINCE2 in Taunton Warehouse project.

2. Main body

2.1 Project management theory

Theory of project management

The theory of project management deals with analysis of the method that is implemented in improving the efficiency of the project. The clarification behind undertaking the board as follows: a great or adequate extent of work is done, an unnecessary work is not done, the work that is done passes on the imparted business reason. The extension is portrayed through the work breakdown structure (WBS). The conceptualization and the standard of disintegrating fill three central needs:

Get Assignment Help from Industry Expert Writers (1)

Planning

The planning of attempts is completely portrayed from the perspective of various information areas in the PMBOK Guide. The planning structures are shifted through centre procedures and engaging strategy. According to Esteki et al. (2020), there are ten centre techniques: scope planning, scope definition, action definition, asset sorting out, advancement sequencing, action length evaluating, and cost looking over, plan movement, cost orchestrating, and undertaking plan improvement. The yield from these frameworks, the undertaking plans and makes up a guarantee to the executing structures.

The arranging structures request the scene in the PMBOK Guide: regardless of the ten engineering structures, there is just one executing framework and two controlling approaches. The accentuation is on sorting out, with little offered on executing particularly.

Execution

The central theory of execution ends up taking after the chance of occupation dispatching in storing up where it provides the interface among plan and work. As mentioned by McGrath and Whitty (2020), the pivotal issue in dispatching is allocation of resources or tasks of assignments or organizations to machines or work gatherings, normally by a focal position. As indicated by a cutting edge definition, work dispatching is a technique that utilizes aware choice guidelines to pick a work for dealing with on a machine that has started late comes open.

 

Get Assignment Help from Industry Expert Writers (1)

Obviously, dispatching contains two sections: choice (for picking a task for a workstation from those predefined errands that are set up for execution), and passing on the task (or support) to the workstation. Here, the covered hypothesis is evidently the old style hypothesis of correspondence where a huge amount of pictures (voice or made talk) is transmitted from sender to beneficiary. In this aspect of PRINCE 2 it is seen that the manager gains experience by learning and it is also beneficiary for the project of Taunton warehouse.

Controlling

Here just execution declaring is thought of, considering execution standard, and related solutions for execution. As mentioned by Rehacek (2017), they obviously identify with the mechanized model of the administrators control (indoor controller model) that contains the going with segments: There is a standard of execution, performance is assessed at the yield (or information), the possible vacillation between the standard and the purposeful worth is used for changing the method with the objective that the standard can be reached.

This indoor controller model is undefined from the analysis control model as portrayed in current control theory.

2.2 Project Management methodology

2.2.1 Discussion of PRINCE 2 methodology

PRINCE2 is an approach of administration that assists in executing ventures in a controller situation. It is the procedure which depends on the strategies to evaluate viable administration of the undertaking. PRINCE2 is a standard system which is utilized broadly and perceived by the UK government and even in private segments in the UK. According to Vaníčková (2017), PRINCE 2 is the approach of procedure direction and its partitions extend in numerous stages with the end goal that it is simpler to finish each phase of the procedure. Each phase of the PRINCE2 technique contains successful plans that should be followed for the finishing of the venture of Taunton Warehouse. The customer of the Supermarket X needs to segment each errand of the task into explicit stages. The task needs to isolate the approach of this undertaking into scarcely any stages and they are depicted as follows:

  • Starting up the project (SU)

The essential phase of this technique incorporates hardly any exercises that should be done under Taunton Warehouse venture. As referenced by Mousaei and Javdani (2018), the customer needs to set up the arrangement of the undertaking and should select an official chief who will be liable for all the prerequisites and finish of errands in this task. The management team should be made for executing the plan of the task. Business cases must be illustrated under this venture by the official management to configure the setting up of it adequately.

 

  • Directing a project (DP)

In this stage, the approval is given to the venture chief for going before the coherence of the Taunton venture (Jamali and Oveisi, 2016). The general task, plan, systems, process and different perspectives are approved by the administration which should be followed further in this undertaking by the supervisory group and administrator.

  • Initiating a project

The inception of systems of the undertaking is planned to the director who will perform the most extreme employment all the while. Task controls are set and plans will be made at this stage.

  • Controlling stage

This stage incorporates the checking exercises that evaluate work to remain under resilience and it must be constrained by the supervisor for the finish of Taunton venture.

  • Managing the delivery of the project

This stage will be performed by the chief who acknowledges and runs the general workforce. The entire group will convey their workforce for the finishing of this task under this procedure.

  • Managing the stage boundaries

This stage happens after the methodology of the executive’s stage where achievement of Taunton venture will be checked on by the task board (Kaczorek et al. 2017). In addition, the exercises of overseeing state limits will be affirmed after a survey by a leading group of Supermarket X.

  • Closing of a project

After finishing the preceding stages, the plan of the conclusion of the undertaking will be readied and the consummation with respect to Taunton venture will be given over to Supermarket X. Prior to that, the whole undertaking will be assessed once and the conclusion of the venture will be suggested based on the result (KONONENKO and LUTSENKO, 2017).

2.2.2 Summarization of the project methodology

7 principles of PRINCE 2

Seven standards can be found by utilizing the PRINCE2 system while assessing Taunton stockroom ventures. They are the widespread standards with the goal that it very well may be applied to accomplish achievement in each term.

Business justification

The Taunton warehouse project is justified as the project is realistic and provides benefits to the customers.

Learn from experience

Learning from experience improves the outcome of the project. The project team should learn each stage of the process clearly (Hughes et al. 2017).

Roles and responsibility

The project manager should have to provide knowledge about each responsibility and role to the workers of the team.

Manage by stages

The executive manager of the project should plan every stage properly as they will be responsible to look after it.

Manages by Exception

The exception needs to be fulfilled by the board of Supermarket X to suit the environment of the project efficiently.

Focus on products

The outcome of the project depends on the efficiency of the management.

Tailoring

The tailoring of PRINCE2 system is alluded to as the proper utilization of this strategy under Taunton venture. This factor of the technique will guarantee that the control, arranging, systems and other fundamental elements of the venture is right. It even decides the right utilization of procedures, topics and standards of the PRINCE2 system under this task (Bishop, 2018).

7 themes of PRINCE 2

The business case gives information in regards to the business case and plans of Taunton Warehouse to guarantee change and hazard the executives of it through PRINCE2. The theme of the organization is required for the venture manager to cause everybody to comprehend their jobs during the Taunton venture. According to Axinte et al. (2017), the nature of the venture is going to follow the fundamental phases of this undertaking under the oversight of the task supervisor. Project plan will portray how the objective will be accomplished. The risk will distinguish the vulnerabilities during the finishing of undertaking. Change in the execution procedure during the venture which will mitigate the risk of the project during the task. Progress tracks the arrangement and execution for this venture to attempt appropriate results of it.

 7 process of PRINCE 2 methodology

Starting phase of procedure incorporates essential exercises for the feasibility of the undertaking. As mentioned by Pace (2019), the approval is given to the task and started for nonstop procedures of the undertaking. After the approval is started, the work goes under the venture arranging. The status of work should be assessed by the administration. After the audit of the board, Supermarket X will be conveyed with the fulfilment of Taunton venture by the task administrator.

2.2.3 Limitations and benefits

Benefits of using the PRINCE 2 methodology

The project methodology is important in meeting the goals of the project. In this aspect, PRINCE 2 methodology is used in order to complete the Taunton warehouse project.

  • PRINCE 2 would help with cantering business support to follow the successful consequences of Taunton Warehouse.
  • It would help in making sense of the approach of the item intending to accomplish and execute appropriate arranging (Costa et al. 2019).

Limitation of the project

  • It may confine venture results to survey with the assistance of senior administration.
  • This will give negative encounters consequently while controlling the undertaking.

2.2.4 Linking PRINCE 2 with the environment of the project

The primary objective of Taunton Warehouse is to underline enrolment, starting conclusion with old locales and moving TUPE among 100 partners. In such a manner, PRINCE2 strategy is going to be used to look at asset recuperation and explore the conclusion of the venture. At first, characterizing and planning of tasks will evaluate with the assistance of venture life cycles to deliver critical impacts. Action rundown will be conveyed to distinguish assets, inventiveness, alongside interests of customers. As referred by Samáková et al. (2017) conveying and advancement of Taunton Warehouse will be made through PRINCE2 to manage whether there is any nearness of vulnerability or not.

Methodical, just as they taught approach will be performed through PRINCE in Taunton Warehouse to configure, execute and complete it in a satisfactory way. As referenced by Alvarez-Dionisi et al. (2016), the structure of the venture will be sorted out with the assistance of undertaking a board where a client will be created as a fundamental official. As the target of Warehouse is to actualize administrations to clients by delivering zero negative effects, along these lines, an official will be mindful to investigate the circumstance (Perrier et al. 2018). Besides, the senior manager of Taunton Warehouse will speak to the client-side of the task and the senior provider will be available to the survey provider. Besides, both undertaking and group chief will be accounted to make progress in the conveyance of goals with respect to Taunton Warehouse.

Controlling of Taunton Warehouse dependent on PRINCE2 will be handled through the task inception stage. Moreover, end-stage and appraisal of the centre phase of the task will be evaluated to feature reports beginning from assets undertaking up to chance administration in this venture. As expressed by Perrier et al. (2018) usage of controlling danger during an appearance in Taunton Warehouse will be represented by sorting out necessities of items to achieve advance and stay practical in that. During change the executives of Taunton Warehouse, endorsement of changes ought to be reflected in it to convey critical documentation of the venture.

In the wake of beginning and starting undertaking with respect to PID and task brief, execution of Taunton Warehouse will be coordinated. Controlling and overseeing limits of each undertaking stage will be made through methods for special case plans. Stage plans and group plans will be surveyed to speak to the conclusive connection between Taunton Warehouse and Supermarket X. Aim of arrangement concerning foundation defence of Supermarket X will be inspected in such manner to work arranging and proceed onward to next techniques from that point (Perrier et al. 2018).

At the point when documentation of Taunton Warehouse will be evaluated through PRINCE2, overseeing and conveying of exercise scholarly will be given. Aside from this, the issue register will be given to support the venture command and a hidden hazard register will be evaluated to explain issues in this undertaking (Perrier et al. 2018). Along these lines, assessment of PRINCE2 will be incorporated and the hypothesis of undertaking the executives will be used to screen Taunton Warehouse.

3. Conclusion

Based on the above study it can be analysed that the report has focused on the theory of project management. The analysis regarding PRINCE2 procedure has been talked about comparable to this task to meet its targets and objectives. Synopsis of the whole undertaking has been connected depending on every seven procedures, seven topics and significantly more regarding PRINCE2. Moreover, benefits just as restrictions have been structured in regards to PRINCE2 in thought with this venture. There are not many limitations created in Taunton Warehouse as far as necessities of 1000 representatives of full time. Thus as to defeat such limitations and ensure a better structure of this venture.

4. Recommendation

  1. The project manager will have to ensure that the stakeholders of the project have a clear knowledge about the roles and responsibilities. If the stakeholders of the project have a clear idea about the project then that will enable them to maintain the quality of the project. This can be done by improving the communication between them.
  2. The executive project manager of Taunton Warehouse will have to formulate a team which will enable them to mitigate the risk of the project by implementing proper tools and techniques (Samáková et al. 2017). Besides, in mitigating the risk of the project they will have to formulate an effective communication plan. This in turn will also have an impact on the efficiency of the project management team.
  3. The venture manager will have to improve the monitoring process. As mentioned by Perrier et al. (2018), if the manager is able to improve the monitoring process then that will enable them to mitigate the risk of the project. This in turn will also help them to improve the outcome of the project.

 

 

 

Reference list

Alvarez-Dionisi, L.E., Turner, R. and Mittra, M., 2016. Global project management trends. International Journal of Information Technology Project Management (IJITPM)7(3), pp.54-73.

Axinte, S.D., Petrică, G. and Barbu, I.D., 2017, June. Managing a software development project complying with prince2 standard. In 2017 9th International Conference on Electronics, Computers and Artificial Intelligence (ECAI) (pp. 1-6). IEEE.

Bishop, W.A., 2018. A project management framework for small-and medium-sized entities: Accounting software implementation. Journal of Economic and Financial Sciences11(1), pp.1-11.

Costa, J.F., Rezende, J.F., Medeiros, J.V. and Veras, M., 2019. INTERNATIONALIZATION THROUGH PROJECT MANAGEMENT: CONSIDERATIONS ON HOW TO UTILIZE THE LCC MODEL® TO SUPPORT THE INTERNATIONALIZATION OF INCUBATED COMPANIES. Iberoamerican Journal of Project Management10(2), pp.15-50.

Esteki, M., Gandomani, T.J. and Farsani, H.K., 2020. A risk management framework for distributed scrum using PRINCE2 methodology. Bulletin of Electrical Engineering and Informatics9(3), pp.1299-1310.

Hughes, D.L., Dwivedi, Y.K. and Rana, N.P., 2017. Mapping IS failure factors on PRINCE2® stages: An application of interpretive ranking process (IRP). Production Planning & Control28(9), pp.776-790.

Jamali, G. and Oveisi, M., 2016. A study on project management based on PMBOK and PRINCE2. Modern Applied Science10(6), pp.142-146.

Kaczorek, K., Krzemiński, M. and Ibadov, N., 2017. The problem of choosing risk management methodology at the example of railway construction. In MATEC Web of Conferences (Vol. 117, p. 00073). EDP Sciences.

KONONENKO, I.V. and LUTSENKO, S.Y., 2017. Method for selection of project management approach based on fuzzy concepts. Bulletin of NTU” KhPI”. Series: Strategic Management, Portfolio, Program and Project Management7(2 (1224)), pp.8-17.

McGrath, S. and Whitty, S.J., 2020. The suitability of PRINCE2 for engineering infrastructure. Journal of Modern Project Management7(4), pp.312-347.

Mousaei, M. and Javdani, T., 2018. A new project risk management model based on scrum framework and Prince2 methodology. International Journal of Advanced Computer Science and Applications9.

Murillo Gomez, D.M. and Jiménez, L.A.T., 2018, December. Use of PRINCE2 as a Project Management Approach for Spatial Audio Developments. In INTER-NOISE and NOISE-CON Congress and Conference Proceedings (Vol. 258, No. 3, pp. 4558-4568). Institute of Noise Control Engineering.

Pace, M., 2019. A correlational study on project management methodology and project success. Journal of Engineering, Project, and Production Management9(2), pp.56-65.

Perrier, N., Benbrahim, S.E. and Pellerin, R., 2018. The core processes of project control: A network analysis. Procedia computer science138, pp.697-704.

Rehacek, P., 2017. Application and usage of the standards for project management and their comparison. Journal of Engineering and Applied Sciences12(4), pp.994-1002.

Samáková, J., Babčanová, D., Hrablikchovanová, H., Mesárošová, J. and Šujanová, J., 2017. Using the Communication Methods, Tools and Support During Management of Project Communication in Industrial Manufacturing Enterprises. Research Papers Faculty of Materials Science and Technology Slovak University of Technology25(41), pp.51-62.

Vaníčková, R., 2017. Application of PRINCE2 project management methodology. Studia Commercialia Bratislavensia10(38), pp.227-238.

Know more about UniqueSubmission’s other writing services:

Assignment Writing Help

Essay Writing Help

Dissertation Writing Help

Case Studies Writing Help

MYOB Perdisco Assignment Help

Presentation Assignment Help

Proofreading & Editing Help

Leave a Comment