CIS120-6 Research Methodologies & Project Management Assignment Sample 2023
Introduction
Project management can be defined as organisational plan by which it becomes possible to deliver something new for a company by modifying internal management scheme. In this study, PRINCE2 is selected as tailored project management methodology for understanding each step of modern ECG machine that can be controlled via wrist. The aim of this study is to forecast legal and ethical issues for wrist ECG machine and this project helps to develop gap analysis tools and frameworks in a correct manner.
Scope of the Report
Heart rhythm disorder is common in Britain and annually more than 100,000 deaths occurred because of improper monitoring of heart beat for patients. On the contrary, Coppola et al. (2016) pointed out that atrial fibrillation is a common disease for this country that reduces rate of immortality among all aged people.
The AliveCor Kardia Band is optional wrist equipment for patients that can help to provide real time information about ECG rate and treatment process becomes faster. As per the opinion of Jamali and Oveisi (2016), it can be assumed that more than 80% heart related disease can be controlled in a proper manner by using this modern system of ECG calculation. On the other hand, stroke viability monitoring can also be possible in near future by using this equipment on a daily scale. Henceforth, this project can able to deliver scope for maximum UK population to live their life at least 5-10 years extra (Axinte et al. 2017).
Project Review
Project management method
Monitoring of real time heart beat becomes easy by using ECG instrument on patients wrist and this new device can deliver proper information about pulse rate as well as heart rate.
- Starting up of project: Self monitoring is required for patients because of time shortage and unavailability of doctors. Background idea for this project develops because more than 1 lac people of United Kingdom are suffered due to improper heart disorders. ECG wrist band can help them to provide suitable space to monitor disease crucially and health facilities can be improved.
- Initiation of project: In this stage, project manager can make an estimated framework for all future tasks and equipments (McGrath and Whitty, 2020).
- Direction of project: Health data can be tracked by accomplishing campaign process and victims are surveyed for 6 months of period (Mousaei and Javdani, 2018).
- Management of stage boundary: All the study participants are examined properly before using it daily basis as this ECG wrist band can harmful for skin of major people. Therefore, pre testing can be acquired for reducing vulnerability of hypersensitivity and allergic reaction.
- Controlling of project: Using of ECG wrist band by majority of UK population can be controlled by maintaining all the ethical and legal issues.
- Product delivery in market: Checking of newly discovered product can be accomplished through National health department of UK. On the other hand, NIH and NICE guidelines can also be followed before delivering in regular market (Murillo Gomez et al. 2018).
- Closing of project: Project can be closed finally by accumulating all the sufficient resources and business equity can be maintained.
Project Strategies
Description | Objective of communication | Frequency | Medium | Target Audience | Owner |
Project Kick off | To explain all objectives | Once | Meetings | Project sponsor | Project manager |
Discussion about progress
|
To analysis of project continuation | Everyday | emails | Project teams | Project manager |
Change in management
|
To make changes | At the middle of project | Meetings | All members | Project manager |
Risk assessment
|
To measure potential risks | Twice a week | Status report overview | Sponsors and investors | Project manager |
Assessment of equipments
|
To monitor all tools working properly | Once per month | In field survey | Project manager | Civil engineers |
Understanding stakeholders perspectives
|
To analyse if there is any complaints | Twice per month | By using collaboration apps | stakeholders | Project manager |
Project Kick off | To explain all objectives | Once | Meetings | Project sponsor | Project manager |
Table 1: Communication plan
(Source: Vaníčková, 2017)
Quality Activity | Product | Product | Quality Method | Producer | Reviewer | Approver | Target Review Date | Actual Review Date | Result | Target Approval Date | Approval Date | Result |
1 | 1 | Staff Listing | Inspection – cross check | Project Sponsor | Project Team | Project manager | March 1, 2020 | March 31, 2020 | Pass | April 2020 | April 2020 | Pass |
2 | 2 | Payment redundancy calculations | Audit | Finance Assistant | Finance Director | Project committee | April 2020 | April 2020 | Pass | May 2020 | May 2020 | Pass |
3 | 3 | Redundancy Payment Calculations | Mathematical check | Finance Assistant | Finance Director | Project Board | April 2020 | April 2020 | Pass | June 2020 | June 2020 | Pass |
4 | 4 | Transfer of ambient to Taunton | Reviews | Project investors | Project sponsor | Project Manager | July 2020 | July 2020 | Fail | October 2020 | October 2020 | Pass |
5 | 5 | Closing of older sites | Performance Test | Project team | Finance | Project manager | November 2020 | November 2020 | Pass | December 2020 | December 2020 | Pass |
Table 2: Quality assurance
(Axinte et al. 2017)
RISKS | IMPACT | |||
PROBABILITY | HIGH | HIGH | MEDIUM | LOW |
MEDIUM | Training | Technology | Customers | |
LOW | Time | Operation of equipment | Budget |
Table 3: Risk matrix
(Source: Coppola et al. 2016)
Project Control
Cybernetic and post-performance project control method can be acquired by project team for monitoring efficiency of newly equipped product. Specific population can be used for daily data tracking in cybernetic process and feasibility of device can also be measured properly (Rehacek, 2017).
Measurements Review
Quality of this project can be measured after its completion and all the legal and ethical issues are monitored with the help of BCS code of conduct. Apart from this, it is an ethical fact to accumulate all health data of customers and store them correctly. NIH and NICE guidelines of UK can be followed majorly to provide better security in project by developing ethical practices (Siegelaub, 2017). PMBOK approach can be used to modify team management and application of RACI Matrix can help to deliver proper information about all tasks and responsibilities of team member.
Significant Lessons
Event
Using of ECG wrist band is the event that has to be accomplished by project team for tracking real time heart beat of patients.
Effect
Positive effect can be applied for heart patients in near future after approval of this project Causes/trigger
Majority of the UK population are suffered by heart disease and it is the main cause to incorporate new technology.
Warning indicators
Skin allergies can be occurred to potential customers after using this modern equipment and it is needed to accomplish test before using.
Recommendations
- Budget is important for any biotechnological project and no proper budgetary amount is set for this project, this has to be analysed further.
- Co-ordination with medical officials is minimum and project participants have lack of biological knowledge, this area can be monitored properly.
- Trial and error are important part for any health related equipment implementation; therefore, it can be suggested to accomplish project under proper deadline.
Conclusion
It can be interpreted from this study that PRICE2 methodology is a proficient approach to implement any modern biological projects because it helps to analyse all stages crucially. In case of this project, wrist band can be manufactured for detecting real time health data of patients suffering in several heart diseases. Therefore, proper communication strategy can be implied by researchers to consult with doctors and other medical professionals whether this device is a suitable approach or not. On the other hand, project manager and other investors have accomplished regular meetings to monitor project progress in a crucial manner. Apart from this, budgetary allocation is more or less proper for this project that helps to conduct all the processes without any hurdles. Moreover, RACI matrix can help to ensure tasks of each project member properly to evaluate functional value for this project.
References
Axinte, S.D., Petrică, G. and Barbu, I.D., 2017, June. Managing a software development project complying with prince2 standard. In 2017 9th International Conference on Electronics, Computers and Artificial Intelligence (ECAI) (pp. 1-6). IEEE.
Coppola, D., D’Ambrogio, A. and Gianni, D., 2016. Bringing Model-based Systems Engineering Capabilities to Project Management: an Application to PRINCE2. In CIISE (pp. 6-15).
Jamali, G. and Oveisi, M., 2016. A study on project management based on PMBOK and PRINCE2. Modern Applied Science, 10(6), pp.142-146.
Jaziri, R., El-Mahjoub, O. and Boussaffa, A., 2018. Proposition of A Hybrid Methodology of Project Management. American Journal of Engineering Research, 7(4), pp.113-127.
McGrath, S. and Whitty, S.J., 2020. The suitability of PRINCE2 for engineering infrastructure. Journal of Modern Project Management, 7(4), pp.312-347.
Mousaei, M. and Javdani, T., 2018. A new project risk management model based on scrum framework and Prince2 methodology. International Journal of Advanced Computer Science and Applications, 9.
Murillo Gomez, D.M. and Jiménez, L.A.T., 2018, December. Use of PRINCE2 as a Project Management Approach for Spatial Audio Developments. In INTER-NOISE and NOISE-CON Congress and Conference Proceedings (Vol. 258, No. 3, pp. 4558-4568). Institute of Noise Control Engineering.
Rehacek, P., 2017. Application and usage of the standards for project management and their comparison. Journal of Engineering and Applied Sciences, 12(4), pp.994-1002.
Siegelaub, J.M., 2017. How PRINCE2® Can Complement the PMBOK® Guide and Your PMP®. APMG International.
Vaníčková, R., 2017. Application of PRINCE2 project management methodology. Studia Commercialia Bratislavensia, 10(38), pp.227-238.
Know more about UniqueSubmission’s other writing services: