Assignment Sample on D31PZ Contracts and Procurement

Introduction

To establish an effective CM project timeline determination as well as the determination of the budget is very important and as well as that quality maintenance and fulfilling the client expectation is very much important. In these parts mainly the issues that can occur in making the procurement are determined and the possible feedbacks that can overcome the problem are also given. The shape of the project achievement is actually determined from the level of procurement sustainability. Procurement is actually an activity that involves different types of work which are essential to obtain better services and goods that are helping the company to obtain support of the consumers as well as the management to perform its daily operation. The procurements are actually including some of the activities which are very important to complete the project successfully. They are- negotiating, including sourcing, for keeping all the records in these process the inspections are done, purchasing item records are also kept here. Now the user needs to know the details of the part of the procurement to do the critical analysis of that. They are cost-reimbursable, fixed-price and material and time.

Critical analysis

Actually the procurement in a construction field is done to determine the quality of the project and the specifications of the raw materials and terms and conditions in purchasing the products. The services that are provided by the suppliers to complete projects are also determined from here and the other importance of the procurement critical analysis are- achieving the best value of the money. The internal control system is also monitored here so that the risk in the project management and designing can be reduced (Agyekum-Mensah and Knight, 2017.). The detailed analysis of the journal is described in a systematic manner. Mainly the comparison is done in the next part on the basis of the JCT and NEC contract. The analysis is very important to find out the details of the contract and by using which a contract can get more work and perform it nicely. In this part mainly all the procurement details are elaborated but the main topic of the assessment is by using what procurement a contractor can perform well.

  1. Project types

 This project is totally based on the construction details and the money needed to complete the project as well as the time that are estimated to complete the project all are given from here. Timeline of the project and the supply procedure and regularity of the suppliers are all mentioned here. The developments of the performance of the engineers on the construction project are also given from here. So, it is mainly a construction project used to make some buildings, flats, temples, multinational buildings etc.

  1. Discussion about the project

Get Assignment Help from Industry Expert Writers (1)

The details of the project discussions are also done from here. Mainly the constructor are going in loss or profit by doing the profit are seen from here and as well as that the project details such as the place of the project development, the partners of the project, stakeholders of the projects all are seen from here. The suppliers of the raw materials of the projects are also determined by the user in these parts. So, it is an important part of the critical analysis of the procurement technology in the construction management sector.

  1. Main finding of the project

The main findings from these procurement analyses of these construction projects are- the details of the supply chain management, Sustainability of the project, details of the lean construction, the technology that are adopted here to develop the project and to make it unique is also given from here. Value management as well as the constructability is also visualized from here.  The estimated cost is also determined from here. So, these are the main findings of these procurement analyses in the construction sector projects.

 

  1. Limitations of the journals

In this limitation part the limitations that are faced by the journals in critical analysis of the construction sector project procurements are given here in detail (Bakir, et al. 2019). It is very much important for a user to know in detail so that he or she can understand why he or she needs to choose another journal to implement the project. In these part to complete the project “Critical analysis of procurement techniques in Construction management sectors” is chosen and the limitation of these is that only the issues are discussed in detail but the solutions are not given nicely.

 

  1. Issues of the procurement technology in construction management

The issues that are stated here can help in increasing the efficiency of the project implementations. The limitations or the issues that can occur in the supply chain are port congestion, Demand forecasting, digital transformation problems etc. the sustainability problems that are generally occurring here are-  approval gaining of using new technologies, insufficient knowledge, issues with the potential labors, regulatory barriers etc. The problems that are faced by the construction site in technology use and innovations are- in maximum case the department is using the old technology to save the money they are not using the new technology as a result of that the advanced designing options are eliminated from there. So, these are some limitations that are seen after the critical analysis of the procurement technology in construction management sectors.

  1. Question related to the project

Get Assignment Help from Industry Expert Writers (1)

The questions in the procurement technologies in the construction site are given here in detail. They are-

  1. What are the Tools that are used in making the procurement of the project?
  2. What are the technologies that are used in making the project?
  3. What is the cost estimation of the particular project?

 

  1. Importance of these analysis

There are many importance of making the procurement critical analysis in a construction sector project. They are-

  1. The details of the bill and the delivery details by the supplier can be monitored from here.
  2. Cost estimation of the total project is also done from here.
  3. Vendor and the catalogue management are also done from here.
  4. solutions

Actually after doing the critical analysis of the procurement it is seen that there are different problems faced by the designer. So, to solve it there are some processes. Actually it is a technological tool which is helping in managing the business and it mainly needs to focus on the “procure-to-pay process effectively” (Dainty, et al. 2017). The steps that can improve the procurement technology are-

  1. For reducing the risk the supply chain needs to be redesigned.
  2. The demand planning needs to be utilized.
  3. Supply chain vulnerability is needed to be monitored and reduced.

Conclusion

So, from here it can be concluded that critical analysis of the procurement technology in the construction sector is very important. Through these the cost estimation can be done very easily and the timeline of ending each and every job can also be done here. The supply chain details are also monitored here in detail and the problem will be overcome here easily.

  Part B

Short essay comparing two contracts

Introduction

Contracts are actually written or spoken promises in between two or more people who are doing the work at fixed prices. And contracts are done within a fixed time. The contracts are actually representing the agreement that is done in between peoples in a specific organization. Actually one party can be stated as the sealer and the other one is stated as the buyer. There can be different types of Agreement or contract. Now the different types of contract are stated here and the used values of that and the used percentages of that are also stated here in the discussion part and two types of contracts that are used here for doing the comparisons are also taken from here and the reason of selecting that are stated here with proper reason. Generally these contracts are of great importance for a specific project so the knowledge details of the user of the above mentioned topic is very important to know.

Discussion

Comparison of two procurement and contracts

The assignment is mainly based on the two types of contract and differences between them are discussed here in details. The types of contract based on which the project is made are- JCT and NEC. In these Part both the details of the contract will be discussed in details and among both which is best will also be discussed.

Generally the JCT contracts are made in between the employees and the contractor’s directly face to face but in case of the NEC is a writing contract where the details of the contract are written in simple English word. All the process is done by following the legal steps. The NEC is known as the New Engineering contractor and it is a new type of contract, which is implemented in the constructional site. The JCT is known as the Joint Contracts Tribunal. NEC is the type of contracts that are actually focusing on the Collaboration approaches as well as the proactive approaches and in opposite the JCT is actually focusing on the traditional types contracts as well as the liabilities and the risk of the contracts and help the user to complete the contract safely. In case of the JCT the contract administrator are engaged in dealing with the contract but in case of the NEC project manager is actually dealing with the contractor. In case of the JCT the master program is made at the beginning only and the program is also rechecked and if there are any gap or drawback that are overcome at the beginning only. But in case of the NEC after making the contract daily updating of the work are done here.  For daily updating the problems are solved in the daily basis for which sometimes the projects are delayed. The project potentiality is increasing in case of the JCT contract so partially it can be stated that the JCT is the best.

In both the cases of contract the contractors are needed to be trained so that they can easily deal with the consumer easily and generally the issues that re faced by the company are focused here and tried to overcome in these section. The JCT types of contracts that are used by the people most are the Intermediate – Building Contract, Standard – Building Contract and the Minor Works – Building Contract. The JCT type of contract is very simple type of contract and these are generally including a contractor and an employer. It is type of product standard form and easy to be used.  These is the reason people are using these contract the most.

The JCT contracts are used in maximum case because these is a set of a “off-the-shelf contracts” which is available by any person who wants to enter into the construction of the building project with another parties that is the main advantages of these contract where the NEC contracts are the legal type agreement that are available in between two parties and cannot be changed once it is made these are the main disadvantages of these contract (Kabirifar and Mojtahedi, 2019). Actually these JCT contracts are allowing the provide different types of design separately for the contractors and the employers. But at the same time the NEC contracting agreements allow the part and part or contract design, employer design simply by expressing the information of the work which is important by the contractor to carry out with the work.

NEC contracts are actually used in the part where the agreements are done with the suppliers and the single point of the contracts most of the time but the JCT Contracts are done by client, owner, principle etc. It is a two party and signal party contracts as well. The money is not fully paid in these cases. This is the reason if the party discovers that the contracts are not working nicely then they can change that in between these are the main advantages of these. The other advantages of these JCT Contracts over NEC contracting agreements are- it is a standard types of Building Contract. JCT Contracts can be stated as the Intermediate contract of building construction. These contracts are also available in case of performing any minor types of work and as well as that major types of construction work whereas the NEC contracting agreements are used only for the minor construction cases. In case of building the management building and designing that these JCT contracts are used the most. Nowadays the NEC contracting agreements are used by the startup or local small companies. All the big and well known companies are using the JCT Contracts for designing the project.

But there are some disadvantages of the JCT which are- these contract policies are difficult to understand and along with that it is actually used most for designing some big projects (Morledge, et al. 2018). These big projects can include office blocks, sports stadia and shopping centers. That can be both private and public sectors. Though these are having some of the disadvantages but still this JCT Contract is the best. There are more types of contracts without these the user needs to know that for future use. They are-

ICE contract. The use rate of these contracts is nearly 1.2 percent and the value of these contracts is 2.1 percent. NCE contract is another important type of contract just like the JCT and these are having the usage rate nearly 7.7 percent and having the value rate of 14. GC contract and ACA contract is having the usage rate of nearly 6.1 and 2.2 percent and the value rate of both are- 2.9 and 5.5 percent. Other types of contracts are also there which are having the usage rate of nearly 2.5 percent and having a rating rate of 1.8 percent.

Conclusion

So, from here it can be concluded that each and every contract is very important for the construction industry but the people are actually willing to follow the latest and most rated contracts to implement the project successfully.  The technology that is used in the contract is also needed to be modern and latest. If the owner is giving the contract then the timeline of the project and the budget of the project can be determined.

Reference List

Journals

Agyekum-Mensah, G. and Knight, A.D., 2017. The professionals’ perspective on the causes of project delay in the construction industry. Engineering, Construction and Architectural Management.

Bakir, S., Khan, S., Ahsan, K. and Rahman, S., 2018. Exploring the critical determinants of environmentally oriented public procurement using the DEMATEL method. Journal of environmental management225, pp.325-335.

Dainty, A., Leiringer, R., Fernie, S. and Harty, C., 2017. BIM and the small construction firm: a critical perspective. Building research & information45(6), pp.696-709.

Kabirifar, K. and Mojtahedi, M., 2019. The impact of Engineering, Procurement and Construction (EPC) phases on project performance: A case of large-scale residential construction project. Buildings9(1), p.15.

Morledge, R., Smith, A.J. and Appiah, S.Y., 2021. Building procurement. John Wiley & Sons.

Yap, J.B.H., Chow, I.N. and Shavarebi, K., 2019. Criticality of construction industry problems in developing countries: Analyzing Malaysian projects. Journal of Management in Engineering35(5), p.04019020.

Herrera, F., Bailenson, J., Weisz, E., Ogle, E. and Zaki, J., 2018. Building long-term empathy: A large-scale comparison of traditional and virtual reality perspective-taking. PloS one13(10), p.e0204494.

Ríos-Rull, J.V., 2021. 4. Models with Heterogeneous Agents. In Frontiers of business cycle research (pp. 98-125). Princeton University Press.

Pettersson, T., Högbladh, S. and Öberg, M., 2019. Organized violence, 1989–2018 and peace agreements. Journal of Peace Research56(4), pp.589-603.

Pietrzyński, G., Graczyk, D., Gallenne, A., Gieren, W., Thompson, I.B., Pilecki, B., Karczmarek, P., Górski, M., Suchomska, K., Taormina, M. and Zgirski, B., 2019. A distance to the Large Magellanic Cloud that is precise to one per cent. Nature567(7747), pp.200-203.

Colson, E., 2017. Tradition and contract: The problem of order. Routledge.

Zampieri, M., Malmasi, S., Nakov, P., Rosenthal, S., Farra, N. and Kumar, R., 2019. Predicting the type and target of offensive posts in social media. arXiv preprint arXiv:1902.09666.