Structural adaptation is a concept in which the old buildings can be reused in a suitable way and for meeting the demands of their clients in order to prepare this place in an approach of living. Due to the structural adaptation clients did not make efforts in constructing a new building and provides an adequate space for the environment in remaining the portions green. Pioneer house which is present in the St. Mary Bourne village and bakery and brewing seemed to be conducted in the previous era. Main aim of this report is to reuse this building for preferring a small cafe and enhance the portions of the building for supporting the rooms for the tourists.

2. Main Body

Details of the two adaptation proposals

The building is situated at the centre of the small village and present just beside the roadside in a closed format. The place is famous for the tourist spots and many people in this current era want to visit the offbeat places and find new spots for travelling which makes them thrilled to reach a new destination. The area seemed to be quite accessible as lots of primary schools and public houses are present in this locality it can attract those youths to attend this cafe quite often.

Proposal 1

Get Assignment Help from Industry Expert Writers (1)

The first proposal that can be provided for the client as a consultant is that they can buy these buildings and reuse this structure which seems to be most appropriate for them. Along with it is not too far away from the city a cafe with hostelling facility can easily be performed in 4,500 sq.ft areas (knightfrank.co.uk, 2021). Beside this construction area the organization can extend easily in vertical conditions and prepares floors in the top level of the buildings as the building is present in a single floor only and it cannot serve the huge facilities in the single floor [Reffered to Appendix 1]. According to Hasik et al. (2019), it can be advantageous for them as they can grab the entire brewing materials and furnished floors with lots of cushions and tables already being present in the store.

Proposal 2

There is a lot of open space in the exterior field and if the new client needs to enhance the space or floor areas they need to enhance its extra faces. According to Lai and Kontokosta (2019), it can help them in enhancing the areas at the ground floor and due to these reasons automatically they can prepare some rooms in the upper floors. Before enhancing their top floors a test needs to be conducted that they follow walls can support the excess loads or not. Beside this actual floor area can be measured from the top floor and it needs to be calculated at the initial stages before buying the plot and no issues can arise in the further segments.

Technical information about the structural implementation of the viable two options

The King post truss is used in the entire structure and the top portion is not concreted but it is covered by using advestors. The building is of single floor and does not acquire any kind of stairs to access the top portions and for maintaining sustainability in a suitable way. According to Al-Obaidi et al. (2017), the adequate portions leftover beside the sitting arrangement needs to be enlarged and provides more access for the people to enjoy their foods within a specific time period. As the areas got increased the new client needs to concrete their top floors and provides an access to prepare rooms for the visitors and perform their business in a suitable way.

A refurbished arrangement needs to be taken into account and prepares their cafes in a more attractive nature by posting some photographs that helps an idea to get the previous history of these buildings and other information. The test of the bricks needs to be performed and any kind of efflorescence’s (White patches that generally present on the body of the bricks) the portions needs some further treatments. According to Mosharraf and Tümer (2018), these things need to be tested before the plastering and painting procedures as few portions need further treatment and it can be recovered by alternative ways [Reffered to Appendix 2]. As the building is prepared in the 19th century the portions that ge4ts damaged need to construct columns in these portions and new portions that need further construction rises on the basis of designing proper foundation details and rectangular columns.

Further enhancement of the broader visibility of the two options

The columns that seemed to be prepared nerds to be designed on the basis of CP 110 and limit state design approaches need to be conducted for the designing of foundations, columns, beams and slabs. In this way, proposal 1 that has been made is to enhance the top floors of the buildings and with adequate number of rooms and balconies to watch the scenario of the village in a suitable way. According to Piva (2019), a proper tie beam needs to be constructed and it can be easy in further proceedings to construct the upper floors as the load from the slab gets transferred to the beams, columns and them in the foundation and gets distributed on the surface.

Get Assignment Help from Industry Expert Writers (1)

The client needs to use this old vibes and tries to repurpose these buildings and provide the flavors of that period and provide them with nostalgic feelings [Reffered to Appendix 3]. Many people have shown their interest in accessing these cafes and spend lots of time in these places by watching the facts about the ancient periods. The client needs to be provided with the existing plan and the extended plan with proper estimates. The estimate needs to be impacted while preparing the slabs, a suitable dog legged stairs having larger width and breadth and the details about the requirement of the products and its market prices (Hong and Yu, 2020). In the picture it has been shown that the water facilities have been enhanced to a greater extent and it seemed to be quite perfect for handling the cafes.

Recommendations for the client

  • Needs to retain the same structure and provide the old vibes for customers- The new client needs to attract their customers with the old vibes of the bakery and provides adequate services for their customers. In order to retain this existing design a proper plan needs to be prepared by using the modern software’s such as Revit or any other BIM software’s.
  • Needs to maintain all the safety measures as required- The safety measures that need to be prepared in a cafe must be followed such as implementation of adequate fire extinguishers. According to Jing et al. (2020), along with it, it needs to leave some spaces around the building structure as guided by their government for plastering, painting and any other purposes.
  • Needs to remain sustainable- Clients need to prepare a load calculation by using the Stadd pro software’s and design the associated bending moments and forces that come in their buildings. According to Yu (2017), after identifying the appropriate amount of loads the building materials need to be chosen and to decrease the cost of the structure they can use blocks and reduce the weight of the structure to a huge extent. Despite that at the top level of the building they can also arrange rooftop restaurants with lots of green plants to enhance the greenery in their buildings in the later stages.

Technical information about the existing building

The building seems to be developed with the high standards bricks and the doors present in the bakery seem to be a single door and louvered windows. According to Foster and Saleh (2021), in order to reuse this building in a suitable way the asbestos sheets that were covered in the top are kept transparent in a few portions and it helps them in gaining adequate amounts of lights in the bakery shop. Material requirement, marketing requirement and labor requirement needs to be taken into account for enhancing the technical viability of the entire project work. Material requirement is considered as an approach for finding the differences of gross requirement and adequate inventory for calculating the necessary equipment.

Labor requirements need to be taken into account and maintain the equation of regular time production necessary for the production per hour (Jing et al. 2020). As per demand of the project 25 manors and 10 workers can complete the project within 8 months as per the change in capacity. The position of the building is quite appropriate in delivering the raw materials in the spot as it is present on the road side and easy for lifting of the product in the upper floors.

3. Conclusion

Based on the above discussion it can be concluded that the entire essay was prepared on the basis of structural adaptation and reuse of a building structure for further enhancement. Essay comprises a wide range of knowledge about the project and the effective factors surrounding the village. Two proper proposals have been provided for the client as a consultant from the industry and needs to be maintained quite adequately. Technical information about the older buildings and new proposed buildings has been provided with some clear views. At the end some recommendation has been provided for the clients who can help them to enhance the quality of their project work and maintain the same vibes properly.

Reference List

Al-Obaidi, K.M., Wei, S.L., Ismail, M.A. and Kam, K.J., 2017. Sustainable building assessment of colonial shophouses after adaptive reuse in Kuala Lumpur. Buildings7(4), p.87. Available at: https://www.mdpi.com/2075-5309/7/4/87/pdf

Foster, G. and Saleh, R., 2021. The Adaptive Reuse of Cultural Heritage in European Circular City Plans: A Systematic Review. Sustainability13(5), p.2889. Available at: https://www.mdpi.com/2071-1050/13/5/2889/pdf

Hasik, V., Escott, E., Bates, R., Carlisle, S., Faircloth, B. and Bilec, M.M., 2019. Comparative whole-building life cycle assessment of renovation and new construction. Building and Environment161, p.106218. Available at: https://www.sciencedirect.com/science/article/am/pii/S0360132319304287

Hong, L. and Yu, W., 2020, October. Study on Conservation and Reuse Planning of Tianjin Airport Historic Buildings. In IOP Conference Series: Earth and Environmental Science (Vol. 587, No. 1, p. 012112). IOP Publishing. Available at: https://iopscience.iop.org/article/10.1088/1755-1315/587/1/012112/pdf

Jing, L., Sun, L. and Zhu, F., 2020, June. The Practice and Enlightenment of Architectural Renovation and Urban Renewal in the Netherlands. In IOP Conference Series: Earth and Environmental Science (Vol. 526, No. 1, p. 012200). IOP Publishing. Available at: https://iopscience.iop.org/article/10.1088/1755-1315/526/1/012200/pdf

knightfrank.co.uk, 2021, ‘Properties with potential: UK country houses in need of renovation’. Available at: https://www.knightfrank.co.uk/blog/2018/07/17/properties-with-potential-uk-country-houses-in-need-of-renovation [Accessed on: 4th May, 2021].

Lai, Y. and Kontokosta, C.E., 2019. Topic modeling to discover the thematic structure and spatial-temporal patterns of building renovation and adaptive reuse in cities. Computers, Environment and Urban Systems78, p.101383. Available at: https://par.nsf.gov/servlets/purl/10132799

Mosharraf, H.M. and Tümer, E.U., 2018. Renovation of Old Industrial Buildings for Contemporary Uses, Case Study: Tenten Factory, North Cyprus, pp. 57-68. Available at: https://iberianjournals.com/wp-content/uploads/2021/01/10.pdf

Piva, M.J., 2019. Building Reuse as a Sustainable Practice in Architecture, pp. 27-39. Available at: https://pdxscholar.library.pdx.edu/cgi/viewcontent.cgi?article=1826&context=honorstheses

Yu, S.Q., 2017, August. Exploration on factors of old industrial building renovation and design practice. In IOP Conference Series: Earth and Environmental Science (Vol. 81, No. 1, p. 012154). IOP Publishing. Available at: https://iopscience.iop.org/article/10.1088/1755-1315/81/1/012154/pdf

Know more about UniqueSubmission’s other writing services:

Assignment Writing Help

Essay Writing Help

Dissertation Writing Help

Case Studies Writing Help

MYOB Perdisco Assignment Help

Presentation Assignment Help

Proofreading & Editing Help

 

 

Leave a Comment